
21
• Calibration
General
The UTC/R is factory calibrated, you can change any setup options
without recalibrating.
During calibration allow a few seconds for signals to stabilise before
accepting the value.
Note: The millivolt source must be connected directly to the input
terminals using copper wire. Remove the CJC board first.
Equipment requirements
•
A suitable, stable millivolt source (accurate to 0.05 mV)
Terminal connections for input calibration
Calibration Stage Signal type Terminal
Input circuit
millivolt source + 2
millivolt source − 3
Input calibration procedure
When the
display shows
Action/Description ENT
ï
Put the instrument in setup mode and scroll through the main menu
CIPn
Press Å or ì
CIPy
Calibrate inputs? Start No
Connect the current source to the inputs (for connections see over page).
E=0
Set the millivolt source to 0.00 mV (and wait a few seconds) Calibrate Skip
E=8
Set the millivolt source to 8.00 mV (and wait a few seconds) Calibrate Skip
E=15
Set the millivolt source to 15.00 mV (and wait a few seconds) Calibrate Skip
E=30
Set the millivolt source to 30.00 mV (and wait a few seconds) Calibrate Skip
E=60
Set the millivolt source to 60.00 mV (and wait a few seconds) Calibrate Skip
AL=Y
Continue with the setup sequence.
Note 1: To discard changes to calibration and setup you can remove the power at this point.
Note 2: If the display shows OPEn check that the input simulator is properly connected.
Comentarios a estos manuales